A safety can is a crucial tool used in UV liner CIPP (Cured-in-Place Pipe) installation to seal the liner during the blowing process. This essential equipment maintains a secure and airtight environment, ensuring proper inflation and positioning of the liner throughout installation.
In trenchless pipe rehabilitation, particularly UV CIPP, the liner must be inflated with compressed air before curing. The safety can securely seals the liner ends, enabling safe and efficient air pressure application for proper installation.
During UV CIPP liner installation, the safety can is clamped onto the liner's open ends to create a secure seal. Compressed air is then introduced through a connected hose system, inflating the liner against the host pipe walls. The liner is subsequently cured using ultraviolet light to harden the resin and complete the rehabilitation.
Application | CIPP liner installation process |
---|---|
Size | DN100-DN1500 (custom-made available) |
Material | Stainless steel |
Daoyunai produces comprehensive trenchless pipe rehabilitation equipment including all required tools for efficient and safe installations.
Using a safety can in UV liner CIPP installation is a critical safety measure that ensures proper sealing and inflation throughout the process. This tool enhances both efficiency and safety for contractors, engineers, and suppliers in the trenchless technology industry.
MOQ: | 1 σύνοδος |
τιμή: | Variable |
Τυπική συσκευασία: | Κανονικό πακέτο |
Περίοδος παράδοσης: | 5-10 εργάσιμες ημέρες |
Μέθοδος πληρωμής: | T/t |
Ικανότητα εφοδιασμού: | 1000 σύνολα ετησίως |
A safety can is a crucial tool used in UV liner CIPP (Cured-in-Place Pipe) installation to seal the liner during the blowing process. This essential equipment maintains a secure and airtight environment, ensuring proper inflation and positioning of the liner throughout installation.
In trenchless pipe rehabilitation, particularly UV CIPP, the liner must be inflated with compressed air before curing. The safety can securely seals the liner ends, enabling safe and efficient air pressure application for proper installation.
During UV CIPP liner installation, the safety can is clamped onto the liner's open ends to create a secure seal. Compressed air is then introduced through a connected hose system, inflating the liner against the host pipe walls. The liner is subsequently cured using ultraviolet light to harden the resin and complete the rehabilitation.
Application | CIPP liner installation process |
---|---|
Size | DN100-DN1500 (custom-made available) |
Material | Stainless steel |
Daoyunai produces comprehensive trenchless pipe rehabilitation equipment including all required tools for efficient and safe installations.
Using a safety can in UV liner CIPP installation is a critical safety measure that ensures proper sealing and inflation throughout the process. This tool enhances both efficiency and safety for contractors, engineers, and suppliers in the trenchless technology industry.